On ENGIE’s proposal, Elengy’s Board of Directors decided to appoint Sandra Roche-Vu Quang as CEO of Elengy effective on June 1st 2019, succeeding Laurence Borie-Bancel, who has been appointed to other positions within ENGIE.

After a very favorable month of March, April has confirmed the return of LNG in Europe with new records of volumes in our terminals!

Fos Tonkin LNG terminal now offers up to 34 LNG truck loading slots per day.

With the objective to guarantee operations continuity for Fos Tonkin terminal beyond 2020, Elengy is now launching a call for capacity subscriptions (“Open Season Fos 2021”).

2018 was a record year for Elengy and its subsidiary Fosmax LNG:
• 215 vessels berthed at our terminals,
• 106 TWh of natural gas delivered to the network, an overall increase of 13 % compared to 2017,
• 21 LNG transshipment operations (berth to berth) and 19 reloading of standard LNG carriers (from shore to vessel),
• 5 843 trucks loaded, an increase of 50 % on 2017.

In the context of a dynamic liquified natural gas (LNG) market, Elengy is preparing the sale of access capacities to the Fos Tonkin LNG terminal for the period 2021-2030.

Alongside the development of new LNG truck loading capacities, Elengy releases a new contract to enhance the scheduling flexibility and the safety.

In a press release published on Tuesday, 20th November 2018, the Port of Marseille Fos announces that it has worked with the economic players in the LNG sector on the feasibility of an operational LNG fuelling solution in Marseille and Fos

Fos Tonkin LNG terminal now offers up to 20 LNG truck loading slots per day.

ENGIE elengy storengy ENDOS GB solid MONO BLACK