A- A A+

04/07/2016 - Fos Tonkin LNG terminal double the capacity of its LNG truck loading facility, to accommodate up to 8 trucks per day from today.

The operation will be performed 24h/24, and improvements of the equipments will increase the safety and reliability of the service. Then, up to 2 200 trucks can be loaded per year from this station.

With the Montoir-de-Bretagne truck loading station, Elengy reaches more than 110 slots per week from its LNG terminals, almost 6 000 per year.

Click here to know more about our LNG truck loading service

ENGIE elengy storengy ENDOS GB solid MONO BLACK