Following Elengy's call for subscriptions in February 2019 for capacities at the Fos Tonkin terminal post 2020 (Open Season Fos 2021), the company is proud to announce the terminal will continue operating the site until 2028.
In order to response to market signals for regasification capacity, Elengy conducted a commercial operation for Montoir-de-Bretagne LNG terminal, from July to November 2019.
Elengy and Rubis Terminal have signed a memorandum of understanding (MOU) to launch preliminary studies for the development of an LNG storage facility at the Reichstett (Bas-Rhin) storage terminal.
Gas infrastructure operators have presented the main conclusions of a joint report submitted to the Minister of Ecological Transition and Solidarity concerning the technical and economic conditions for the integration of hydrogen into their infrastructures.