Primary capacities

visuel

Elengy provides its clients with monthly capacity statements at its three LNG carrier terminals. The annual schedules for each LNG carrier terminal are also published for the current year. All capacities are defined on the basis of Elengy’s existing commitments on the day that they are updated. This data is for information purposes only and is non-binding for Elengy.

Primary capacities

Monthly LNG reception capacities for each of the LNG terminals at Fos-sur-Mer and Montoir-de-Bretagne are published monthly on this website, for a calendar year, giving specific details 

Long-term annual capacities for LNG reception at Fos and Montoir LNG terminals are also published

 

Bookable directly with Elengy, this primary capacity is offered and allocated on a first-come first-served basis. 

 

All these capacities are specified on the basis of Elengy's commitment on the day they are updated. They are given exclusively for information purposes, and are not binding for Elengy. 

 

The booking and terminal access capacity allocation methods are described in the  

Allocation Rules in the Terminal Access Contract’s General Conditions (link to the contracts) 

All
Montoir-de-Bretagne
Fos Tonkin
Fos Cavaou
Available capacities (Montoir-de-Bretagne)
Download the document (0.07 Mo)
Available capacities (Fos Tonkin)
Download the document (0.07 Mo)
Available capacities (Fos Cavaou)
Download the document (0.07 Mo)
Available capacities (Montoir-de-Bretagne)
Download the document (0.07 Mo)
Available capacities (Fos Tonkin)
Download the document (0.07 Mo)
Available capacities (Fos Cavaou)
Download the document (0.07 Mo)

Current LNGC operations schedules

Current schedule for each terminal (weekly update).

 

Contact us for more information
All
Montoir-de-Bretagne
Fos Tonkin
Fos Cavaou
Current operations schedule (Montoir-de-Bretagne)
Download the document (0.06 Mo)
Current operations schedule (Fos Tonkin)
Download the document (0.06 Mo)
Current operations schedule (Fos Cavaou)
Download the document (0.06 Mo)
Current operations schedule (Montoir-de-Bretagne)
Download the document (0.06 Mo)
Current operations schedule (Fos Tonkin)
Download the document (0.06 Mo)
Current operations schedule (Fos Cavaou)
Download the document (0.06 Mo)

LNGC operations annual schedules for 2024

Reference annual schedule for each terminal, as published on 15 Dec. 2023.

All
Montoir-de-Bretagne
Fos Tonkin
Fos Cavaou
Operations schedule 2024 as per 15/12/2023 (Montoir-de-Bretagne)
Download the document (0.06 Mo)
Operations schedule 2024 as per 15/12/2023 (Fos Tonkin)
Download the document (0.05 Mo)
Operations schedule 2024 as per 15/12/2023 (Fos Cavaou)
Download the document (0.06 Mo)
Operations schedule 2024 as per 15/12/2023 (Montoir-de-Bretagne)
Download the document (0.06 Mo)
Operations schedule 2024 as per 15/12/2023 (Fos Tonkin)
Download the document (0.05 Mo)
Operations schedule 2024 as per 15/12/2023 (Fos Cavaou)
Download the document (0.06 Mo)

Maintenance schedule 2024

Find out about our terminals' maintenance schedule for 2024

All
Montoir-de-Bretagne
Fos Tonkin
Fos Cavaou
2024 works schedule and maintenance programme - Montoir-de-Bretagne
Download the document (0.23 Mo)
2024 works schedule and maintenance programme - Fos Tonkin
Download the document (0.2 Mo)
2024 works schedule and maintenance programme - Fos Cavaou
Download the document (0.2 Mo)
2024 works schedule and maintenance programme - Montoir-de-Bretagne
Download the document (0.23 Mo)
2024 works schedule and maintenance programme - Fos Tonkin
Download the document (0.2 Mo)
2024 works schedule and maintenance programme - Fos Cavaou
Download the document (0.2 Mo)

Maintenance schedule 2025

Find out about our terminals' schedule for 2025

All
Montoir-de-Bretagne
Fos Tonkin
Fos Cavaou
2025 works schedule and maintenance programme - Montoir-de-Bretagne
Download the document (0.24 Mo)
2025 works schedule and maintenance programme - Fos Tonkin
Download the document (0.2 Mo)
2025 works schedule and maintenance programme - Fos Cavaou
Download the document (0.2 Mo)
2025 works schedule and maintenance programme - Montoir-de-Bretagne
Download the document (0.24 Mo)
2025 works schedule and maintenance programme - Fos Tonkin
Download the document (0.2 Mo)
2025 works schedule and maintenance programme - Fos Cavaou
Download the document (0.2 Mo)

Tanker Trucks operations programme

Today, Elengy offers a range of solutions for the flourishing market in LNG fuel, and more generally road-transported LNG.
There is a section dedicated to the small-scale LNG within the List of Interested Parties. It includes the names of companies active on our terminals and wishing to have their names published.

Tanker Truck loading (all 3 terminals)
Download the document (0.17 Mo)