Gradual restart of gas send-out at Montoir-de-Bretagne
Corporate -
Montoir-de-Bretagne
02 June 2021
Elengy has resumed the gas send-out in to the transmission grid from the Montoir-de-Bretagne LNG terminal.
The schedule of flows and stocks at the terminal as well as the vessel programme are regularly updated on the corresponding pages.