A- A A+

Since 1st April 2015, Elengy gives extra flexibility to S-30 and S-SPOT regasification services with the possibility for shippers to have a send-out duration between 20 and 30 days.

In addition, Elengy's regasification offer shows a 4.2% decrease in average on the new tariff for Montoir-de-Bretagne LNG terminal.

This flexible terminal, close to market and production areas, becomes even more attractive to accommodate LNGs coming from the Atlantic basin.

For further information, please refer to our Tariff conditions section.

ENGIE elengy storengy ENDOS GB solid MONO BLACK